| |
|
|
| |
|
|
| |
Title |
Date |
| 201. |
Faisalabad Urban Transport Society (FUTS) (Preliminary
Evaluation) (NTRC-195). |
Oct 1996 |
| 202. |
Further Analysis of Axle Load Data
(NTRC-196). |
Nov 1996 |
| 203. |
8th Course on Transportation Projects Planning
(NTRC-97). |
Dec 1996 |
| 204. |
Various Types of Asphaltic concrete Mixes
Used in Road Construction (NTRC-202). |
Dec 1996
|
| 205. |
Stabilization of Clay Subgrade by Water Injection
(NTRC-197). |
Mar 1997 |
| 206. |
Highway Maintenance Management
(NTRC-198). |
May 1997 |
| 207. |
Non-Mechanised Road Transport and Rural Area
(NTRC-199). |
June 1997 |
| 208. |
Rail Transport Modes of 21st Century
(NTRC-200). |
June 1997 |
| 209. |
Report on Lahore-Islamabad Motorway
(NTRC-201). |
June 1997 |
| 210. |
Road Surface Texture in Islamabad
(NTRC-203). |
Sep 1997 |
| 211. |
Existing Toll Revenues Vs Maintenance Cost
(NTRC-204). |
Sep 1997 |
| 212. |
Calibrating Road Roughness Measuring
instruments (NTRC-205). |
Oct 1997 |
| 213. |
Manual of Calibration of Lab. Equipment
(NTRC-206). |
Oct 1997 |
| 214. |
Evaluation of Islamabad Runway Pavement
(NTRC-207). |
Dec 1997 |
| 215. |
Proposal for Urban Transport Wing in NTRC
(NTRC-98). |
Jan 1998 |
| 216. |
Integration of Port and Inland Transport
Facilities (NTRC-212). |
Feb 1998 |
| 217. |
Evaluation of Mian channu Sahiwal Section (N-5) Evaluation
(NTRC-208). |
May 1998 |
| 218. |
Chemical Soil Stabilization in Pavement
Structures ( A Lab Investigation) (NTRC-209). |
May 1998 |
| 219. |
Motor Vehicle on roads (1991-1997)
(NTRC-210). |
July 1998. |
| 220 |
Quality
Control of NWFP – Bituminous Roads (NTRC-236) |
|
| 221 |
Quality
Check of Asian Development Bank funded Farm-to-Market Roads, Phase-I
Project (NTRC-235) |
|
| 222 |
Inspection
and detail investigation of rehabilitation work of N-5 between
Lahore – Gujranwala (NTRC-237) |
|
| 223 |
Report
on National Transport Research Centre (Restructuring of the
Communications Division, its Attached Departments, Subordinate
Offices, Autonomous Bodies and Corporations (NTRC-214) |
|
| 224 |
Construction
of Low Cost Roads (Final Evaluation Report), (NTRC-213) |
|
| 225 |
Distress
Analysis of Kashmir Highway (NTRC-215) |
|
| 226 |
Report
on Concrete Core Extracted from Box Culvert Provincial Highways
Project Contract Package No. 5 (NTRC-216) |
|
| 227 |
A
Study on Truck Body Sizes in Pakistan (NTRC-220) |
|
| 228 |
Fundamental
Tests on Subgrade Material of Highways in Islamabad (NTRC-217) |
|
| 229 |
Rut
Resistant Mix Design (NTRC-218) |
|
| 230 |
Faisal
Avenue – Jinnah Avenue Intersection Manual Versus Signal Operation
(NTRC-219) |
|
| 231 |
Technical
Report on the Visit of Coastal Highway (Liari – Ormara Section )
(NTRC-221) |
|
| 232 |
School
Parking Problem Case Study Beacon House - City School Islamabad
(NTRC-222) |
|
| 233 |
Failure
Causes of N-35 (Sarai-Saleh to Muslimabad) (NTRC226) |
|
| 234 |
A
Comparison of Pakistan Road & Road Transport Statistics
(NTRC-225) |
|